Completed Projects

Sewerage House Connections (Stage -1) in Al- Hilal
Client: Mirrikh Contracting W.L.L

  • Demolition of septic tanks
  • Fixation of chambers
  • Pipelaying and fixing
  • ReinstatementBackdrop and Ramp Connections to Manholes


Pavement works – Gabro Port, Um Saeed

Client: Six Construct 

  • Removal of existing Interlock.
  • Sand leveling.
  • Interlock Fixing.


Sewerage House Connections in Al- Gharaffa

Client: Al Waha Contracting Company
  • Demolition of septic tanks
  • Fixation of chambers
  • Pipelaying and fixing
  • Reinstatement


Renovation Work at Khalifa Stadium

Client: Mid Mac Six Construct Joint Venture
  • Block Work
  • Tile fixing
  • Interlock Fixing


Construction of Radio TV Complex

                 Client: Tag Engineering and Contracting

 Our scope of work involved following:

  • Construction of Road Gullies and Soak ways
  • Construction of Sewerage Network.
  • Construction of CCTV Manholes and duct bank.
  • Laying and preparation of bed for 2km road.
  • Interlock work for area around 25000m2.
  • Trenches and Backfilling.


Pavement Project in Qatar Gabbro Port

Client: Six Construct

  • Fixing of Kerbstone
  • Interlock